News
Scheduled Overhaul Has Been Performed at Noyabrsk CCPP
Scheduled overhaul of the main equipment has been performed on the first power generating unit of Noyabrsk CCPP.
LLC “Noyabrsk CCPP” and LLC “Kurgan CHPP-2” topped the Generating Companies Efficiency Rating
LLC “Noyabrsk CCPP” and LLC “Kurgan CHPP-2” topped the Generating Companies Efficiency Rating, which was prepared by the experts of NP “The Market Council”. Noyabrsk CCPP and Kurgan CHPP-2 are acknowledged to be the best in 2015, based on the criterion: “Generating equipment performance efficiency”.
Noyabrsk CCPP has passed the power validation test
The System Operator of the United Power System” has approved the results of the scheduled power requalification at Noyabrsk CCPP. The power plant confirmed its capability to carry the maximum electrical load of 124 MW.
Heads of the Yamal municipalities visited the Noyabrsk CCPP
Eugeny Miskevich, First Deputy Governor of the Yamalo-Nenetz Autonomous District and the Heads of the Yamal municipalities paid a working visit to the Noyabrsk CCPP.
Первый заместитель губернатора ЯНАО Евгений Мискевич и главы муниципалитетов Ямала посетили с рабочим визитом Ноябрьскую парогазовую электростанцию.
The Noyabrk CCPP has generated the first billion kW/h
The Noyabrsk Combined Cycle Power Plant (Noyabrsk, the Yamalo-Nenetz Autonomous District) has generated the first billion kWh
Noyabrsk CCGT PP 3rd power unit construction is possible
The meeting on reforming of the Noyabrsk housing complex under the chairmanship of Dmitry Kobylkin, YNAD governor, involved discussion of prospects of construction of the Noyabrsk CCGT PP 3rd unit
«Intertechelectro-New Generation» put Noyabrsk CCGT PP into operation
Formal putting into operation of the Noyabrsk CCGT PP (122 MW and 95 Gcal/h) took place on November 19, 2010 in Noyabrsk.
Noyabrsk CCGT PP 2nd unit has been successfully tested
The Noyabrsk (YNAD) CCGT PP 2nd unit equipment comprehensive testing and working capacity approval has been successfully conducted.
Dmitry Kobylkin, YNAD governor, has visited Noyabrsk CCGT power plant
Dmitry Kobylkin, Governor of the Yamal-Nenets autonomous district, under the working trip has visited the Noyabrsk CCGT PP.
Noyabrsk CCGT PP 1st power unit has passed comprehensive testing
The 1st power unit has successfully passed comprehensive testing at the Noyabrsk CCGT power plant (YNAD).
Noyabrsk CCGT PP gas turbine generator trial launch
According to the electric testing program, the 1st power unit GT generator was connected to the mains under commissioning works.
Noyabrsk CCGT PP turbine trial launch
The 1st power unit GT trial firing achieving idle stroke was conducted.
Power unit for the Noyabrsk CCGT power plant is approved
Supervisory Board of the non-profit partnership «Market board» has approved power unit monthly feasible payment for the Noyabrsk CCGT PP for year 2010. The station power 1 MW will cost 820,000.00 rubles per month. All the Noyabrsk CCGT PP output will be sold on wholesale electricity and capacity market (WECM).
Commissioning works are being performed at the 1st power unit of the Noyabrsk CCGT PP
Commissioning works are being fulfilled on the 1st power unit major equipment of the Noyabrsk CCGT PP (YNAO). The 1st power unit steam turbine is put to the hydraulic ratchet pump.
DCS installation is completed at Noyabrsk CCGT power plant
The DCS has been installed at the Noyabrsk CCGT power plant (Yamalo-Nenets autonomous district). It will permit to simplify the plant control and increase its efficiency.
General Electric experts are training Noyabrsk CCGT power plant personnel
The engineering staff of the Noyabrsk CCGT power plant (Yamalo-Nenets autonomous district) undergoes special training on General Electric MARK VI. The knowledge the employees get will help them to create programs for the equipment control and its further operation.
New generation turbo-generator is installed at Noyabrsk CCGT power plant
The 25 MW TTK-25 turbo-generator erection has been completed in the main building of the Noyabrsk CCGT power plant (Yamalo-Nenets autonomous district). The Noyabrsk CCGT power plant has become the first power facility in Russia where such a turbo-generator was installed.
The auxliaries are energized at the Noyabrsk CCGT power plant
The auxiliaries are energized at the Noyabrsk CCGT power plant site. The energization is intended for commissioning works of the 62 MW power unit #1 and common plant equipment
The Noyabrsk CCGT power plant is hiring operating personnel
Operation of the 124 MW Noyabrsk CCGT power plant (Yamalo-Nenets autonomous district) will be done by the operating and engineering staff of the «Service New Generation» (member of the «Intertechelectro-New Generation» group of companies). The Noyabrsk CCGT PP will be staffed completely by March 01, 2009.