- 2006 – Commissioning, repair and adjustment operations at Chelyabinsk CHP-3 for JSC «Fortum»
- 2006-2007 – Commissioning work at District Thermal Power Plant «Strogino» (Moscow)
- 2006 – Adjustment work at 110/35/6 kV Substation «Bridge» (the town of Perm)
- 2006 - Installation of the control software and hardware system for Boiler No2 and commissioning of the automated process control system for Boiler units No 2 and 4 at the Artyomovskaya CHP, owned by JSC «TGC-9»
- 2006 – A range of jobs and services, related to routine equipment repair and maintenance at the facilities of the «Surgut power networks» – a branch of JSC «Tyumenenergo»
- 2007 – Equipment maintenance services for the automated process control system of the Artyomovskaya CHP, owned by JSC «TGC-9»
- 2006 – 2007 – Operating sevices, related to operation of 10 boiler houses for the «Tyumen power networks» - a branch of JSC «Tyumenenergo»
- 2007 - Routine repair and maintenance operations at the facilities of the «Tyumen power networks» – a branch of JSC «Tyumenenergo»
- 2007 – 2010 – A range of commissioning works, involving the main and auxiliary equipment, and works related to the implementation of an automated process control system and an automated information and measuring system for commercial energy metering at the 124MW Noyabrsk CCPP (the town of Noyabrsk, the Yamal-Nenets Autonomous District)
- 2009 – to date - A range of commissioning works, involving the main and auxiliary equipment, and works related to the implementation of an automated process control system and an automated information and measuring system for commercial energy metering at Kurgan CHP-2 (222MW) (the town of Kurgan)
- 2008 – 2011 - A range of commissioning works, involving the main and auxiliary equipment, and works related to the implementation of an automated process control system and an automated information and measuring system for commercial energy metering at the 315MW Priobskaya GTPP for LLC «RN-Yuganskneftegas» (the Khanty-Mansiysk Autonomous District)
- 2008 – 2011 - A range of commissioning works, involving the main and auxiliary equipment, and works related to the implementation of an automated process control system and an automated information and measuring system for commercial energy metering at Chelyabinsk CHP-3 (230MW) for JSC «Fortum»
- 2008- to date - A range of commissioning works, involving the main and auxiliary equipment, and works related to the implementation of an automated process control system and an automated information and measuring system for commercial energy metering at the 110MW Vologda CHP for JSC «TGC-2»
- 2008 – 2011 – Operation and maintenance of power park «Yuzhnoye Khylchuyu» (125MW), owned by LLC «Naryanmarneftegas»
- 2010 – to date - Operation and maintenance of the 124MW Noyabrsk CCPP (the town of Noyabrsk, the Yamal-Nenets Autonomous District)